Skip to main content
< All Topics
Print

MALLS and RI setting position

Record: 326


Category: General
Product:
Sample:


Question
1. The material is a polyethylene oxide blend of 4,000, 300,000, and 6,000,000 2. The solvent/mobile phase is water

 
 

Answer
The researcher recommended to place RI after MALLS (i.e, Injector -> column -> MALLS -> RI). It is best to keep the connecting tube short. Also she mentioned that it is not a good idea to use a splitter. Because it will lower the sensitivity. So if you are worried about breaking either detector, maybe it is good to have pressure controller/monitor.

 
 
Additional Comments

image_pdfDownload or Print PDF
Shopping Cart
➤
Scroll to Top
Select more than one item for comparison.
Skip to content