Skip to main content
Print

How to Install the Shodex NH2P-50G 4A Guard Column

Record: 930


Category: Column Usage
Product: NH2P-50G 4A
Sample: N/A


Question
What is the correct way to install the NH2P-50G 4A guard column?

Answer

The NH2P-50G 4A guard column should always be installed upstream of the analytical NH2P column, following the flow direction arrows on each column.

  • Connect the guard securely in front of the analytical column inlet.

  • Ensure all fittings are properly tightened and there is no dead volume between the guard and the column.

  • The guard column protects the analytical column by trapping particulates and strongly retained impurities. Replace the guard column regularly if backpressure increases or peak shape deteriorates.

Additional Comments

image_pdfDownload or Print PDF
Shopping Cart
➤
Scroll to Top
Select more than one item for comparison.
Skip to content